The Pascua Yaqui Multipurpose Justice Center will be a 61,000sf complex consisting of several new buildings for the Pascua Yaqui Justice Building and Police Department.
The holding facility will contain 21 beds and a Central Control. The building will be constructed of load bearing masonry, steel framing, and poured-in-place concrete slabs. The exterior of the building will be a mix of split-face CMU, ground-face CMU and cement plaster over CMU. Additional buildings on site include: a 2,800sf office building, a 500sf animal shelter and a 5,000sf classroom building associated with the temporary holding. These buildings will also be constructed of load bearing masonry, steel framing, and poured-in-place concrete slabs. The exterior of the buildings will be CMU and cement plaster over CMU.
The site is approx. 5 acres. Site work will include a central courtyard with water feature, entry plaza, asphalt parking area for 167 vehicles, a secure sallyport and landscaping. The courtyard and entry plaza will be constructed of concrete paving. The project is located on South Camino de Oeste, Tucson, Arizona.
Instructions to Bidder in PDF Instructions to Bidder in Word Document
Building Layout 1 | Building Layout 2 | Building Layout 3 | Building Layout 4 | Building Layout 5
| Contact Infomation | |||
| Administration: | Jim Rosovich Contracting Officer | ||
| Phone | (520) 879-5142 | ||
| FAX | (520) 879-5133 | ||
| Pascua Yaqui Tribe | |||
| Procurement Department | |||
| 7474 S. Camino De Oeste | |||
| Tucson, AZ 85757 | |||